Chapter 12.20 PERMIT TO USE PUBLIC PLACES
This chapter is included in your selections.
Sections:
- 12.20.010 Definitions.
- 12.20.020 Construction standards.
- 12.20.030 Permit required – Roads, permits and exemptions.
- 12.20.040 Contents of permit application.
- 12.20.050 Processing of permit application – Time limit for commencing and completing work.
- 12.20.060 Bond or indemnity deposit – Generally.
- 12.20.070 Bond or indemnity deposit – Multiple permits.
- 12.20.080 Bond or indemnity deposit – Exemptions.
- 12.20.090 Indemnification of borough required.
- 12.20.100 Revocation of permit – Removal of structures – Unauthorized locations.
- 12.20.110 Fees.
- 12.20.120 Overhead charges for reimbursable borough services.
- 12.20.130 Issuance of permit.
- 12.20.140 Deferment of permit action – Control of work.
- 12.20.150 Notification of commencement of work.
- 12.20.160 Notification of borough departments prior to work interfering with use of streets.
- 12.20.170 Delay in completing work.
- 12.20.180 Conduct of work.
- 12.20.190 Occupation of public places.
- 12.20.200 Repair of damage to street.
- 12.20.210 Notification of completion of work.
- 12.20.220 Inspection of work – As-built information.
- 12.20.230 Responsibilities of permittee and owner after completion of work.
- 12.20.240 Right to maintain pipes and conduits or make emergency excavations.
- 12.20.250 Report of emergency situations and protection of public safety.
- 12.20.260 Right of borough to use occupied area in emergency situations.
- 12.20.270 Assignment and transfer of permit.
- 12.20.280 Waivers.
- 12.20.290 Removing or disturbing survey markers.